top of page

Drillquip Mud Pump

Project Name

H&H 1000HP MUD PUMP

Sector

Coal Seam Gas / Oil Exploration

Date

July - October 2018

Client

Drillquip Pty Ltd

Scope

Weighing 18 tonne, this piece of equipment is used for oil well drilling in the Surat Basin.

 

Masterblasters provided technical advice to ensure the correct coating system was applied to protect against corrosion and extend the life span of the Drillquip engineered pump.

 

Inspections and minor repairs occurred during prep, followed by precision abrasive blast and a 3-coat protective painting system using quality industrial primers and paints providing corrosion protection for up to 15 years. Care and attention was taken to throughout the process prevent grit from entering the gearbox. 

Interested in a quote?

Call us on 07 4634 6106

Contact Us
Office

© 2026 by MODO Agency.

For all industrial blasting and protective coating enquiries, please don't hesitate to fill out the form below for a detailed quote. 

Employment

We offer a supportive, safe and innovative work environment. Please send a cover letter together with your resume to: info@masterblasters.com.au

Facebook
LinkedIn

Opening Hours:

Monday - Thursday: 7.00am - 4.30pm

Friday: 7.00am - 2.30pm

11 Enterprise Street

PO Box 9201

Toowoomba, QLD 4350

 

Email: info@masterblasters.com.au

Phone: 07 4634 6106

bottom of page